New construction of an Administrative and Manufacturing Building Surface Finishing Berlin -Marienfelde Motzener Str. 5
Client: OTB GmbH & Co
Design: AB Nossinske
1991-1992 Floor space 8,104 sq m
Cubic volume 30,293 cb m
Realization and detailed project-planning
A new prefabricated reinforced concrete building consisting of four parts with an attached aerated concrete facing. The complex divides into two three-storey manufacturing buildings, a one-storey linking block for storage purposes, and a four-storey administrative building. Both the reception and the administrative parts are projecting and rack back towards the upper floors. They were supplied with a sloping glass facing along the building axis. The time limit and the building costs were the decisive factors for the method of construction.