New construction of
an Administrative and
Manufacturing
Building

Surface Finishing
Berlin -Marienfelde
Motzener Str. 5

Client:
OTB GmbH & Co

Design:
AB Nossinske
Realization and detailed project-planning
A new prefabricated reinforced concrete building consisting of four parts with
an attached aerated concrete facing. The complex divides into two three-storey
manufacturing buildings, a one-storey linking block for storage purposes,
and a four-storey administrative building. Both the reception and the administrative parts are projecting and rack back towards the upper floors.
They were supplied with a sloping glass facing along the building axis. The time limit and the building costs were the decisive factors for the method of construction.